Can the vanity or shower move in an ensuite?
It can be possible, but moving either one means moving its water supply and waste, so it needs checking at the property before it goes in a quote. Where the drainage can run and how the floor is built decide what is practical.
Mark the position you want on a sketch and ask the renovator what the change adds to the work.
Can I fit a walk-in shower in a small ensuite?
That depends on the room's measurements, where the floor waste can sit and how the floor can be graded to it. Ask for the shower, screen and door swing to be drawn on the plan so you can see the space left around the vanity and toilet.
If the room is tight, ask what the options are before choosing a screen or shower base from a showroom.
How do you renovate an ensuite while using the bedroom?
Agree the route through the bedroom, how dust and noise will be kept down and where the bedroom furniture will go before work starts. Ask for protection of the bedroom floor and walls, and making good of any finishes outside the ensuite, to be written into the scope.
If the household needs the bedroom during the work, say so in your enquiry.
How long does an ensuite renovation take?
The schedule in your quote is the answer for your room, and this site doesn't give a standard duration. An ensuite goes through the same stages as a full renovation: strip-out, plumbing and electrical rough-in, waterproofing, tiling and fit-off.
Read about the stages that set a renovation timeline.
